Sturmmöwe: Shipyard Maintenance Completed
From September to December 2024, the ship Sturmmöwe underwent standard class renewal maintenance at the shipyard. The paint was renewed, and the water pipes were replaced.
After the maintenance was completed as planned, the ship is now fully prepared to resume its operations with reliable performance.